
High-Rise City Solar
Urban rooftops present brutal constraints: limited space, lift-shaft logistics, helicopter restrictions. Total Solar Solutions Australia conquered Docklands complexity with 99.8 kW of AIKO Neostar 2P 475W panels—industry-leading energy density that delivers commercial-scale output where every square meter counts and every panel traveled through the lift shaft for the final two floors.
Project results
+8%
Installed Capacity
112,590 kWh/year
Annual Power Generation
10,129 AUD/year
Annual Savings
51.8 tonnes/year
Annual CO₂ Reduction

Project challenge
An urban high-rise rooftop installation required precision layout, custom rail systems, and careful logistics planning to integrate a 99.8kW system while managing constraints of dense cityscape and helicopter access restrictions.



Solution
The strategic design using AIKO Neostar 2P 475W panels delivers 8% higher output despite urban rooftop constraints. The modular system design enabled efficient delivery, assembly, and performance on Melbourne’s densest rooftops.
ClientTestimonial
This installation was unique due to requiring the most efficient solar module available due to high energy usage and limited roof space. Proportionally AIKO 475W panels became the best fit for the project.
Christine Kennedy
Total Solar Solutions Australia
Related Projects