Morning Peak Manufacturing
Conventional solar peaks at noon, but manufacturing shifts start early. Understanding that, Exceed Solar engineered custom tilt frames with AIKO Comet 600W panels for a 176.43 kW commercial system in Wingfield, South Australia. The strategic engineering approach helps shift peak generation into morning and early afternoon hours, synchronizing renewable energy supply with the facility’s highest production demands and maximizing operational cost savings when electricity consumption is greatest.
Project results
+15%
Installed Capacity
208,950 kWh/year
Annual Power Generation
18,806 AUD/year
Annual Savings
96 tonnes/year
Annual CO₂ Reduction

Project challenge
The manufacturing facility required the majority of solar generation during morning peak operating hours when production demands are highest, a timing mismatch that required strategic system design.



Solution
Custom tilted frame engineering with AIKO 600W Comet modules delivers 15% higher output with generation profiles specifically aligned to morning and early afternoon manufacturing schedules, ensuring peak solar availability matches peak operational needs.
ClientTestimonial
The customer required the majority of their solar energy production to occur during the morning and early afternoon to align with their manufacturing operating hours. We strategically installed AIKO 600W Comet panels on a custom tilt frame, designed to optimise energy generation earlier in the day.
Corey Evans
Exceed Solar