
Off-Grid Fabrication Power
Expert Energy Co replaced a failing 8 kW hybrid inverters and 47 kW of AIKO Neostar 470W modules, transforming unreliable backup into bulletproof three-phase power for this Boonah, Queensland commercial fabrication facility. The off-grid upgrade means continuous welding, machining, and production without grid dependency or interruption.
Project results
+11%
Installed Capacity
57,300 kWh/year
Annual Power Generation
4,584 AUD/year
Annual Savings
25 tonnes/year
Annual CO₂ Reduction

Project challenge
A commercial fabrication facility with a poorly performing 8kW/5kW hybrid system needed a complete replacement to reliably power continuous operations with consistent power supply and reduced reliance on grid backup.



Solution
The system delivers 11% higher output with exceptional reliability, ensuring uninterrupted power for manufacturing processes including heavy-duty lathe equipment. This commercial off-grid installation showcases how modern solar technology can support demanding industrial operations while achieving true energy independence.
ClientTestimonial
The client had a poorly performing 8kW/5kW inverter off-grid system paired to a lead acid battery bank. We designed a system using high-efficiency AIKO panels that exceeds his expectations.
Jayden Blanch
Expert Energy Co
Related Projects