01 What solar system is installed at Hawaiian’s Bassendean?
A 337kW rooftop solar system installed by West State Electrics, using AIKO Nebular lightweight panels, S-5! racking and three Sigenergy 100kW hybrid inverters.
02 Why use lightweight solar panels?
The roof had weight limits. AIKO Nebular lightweight panels weigh 8 kg, a third of a standard panel, so the system could be installed without overloading the roof.
03 How long did the project take?
About eight weeks on site. Western Power approvals and design took around 12 months beforehand, so commercial projects should start approvals early.