Project results
According to measurements, the power generation capacity of ABC modules used in this project is 10% higher than that of conventional modules, the BOS cost per watt is reduced by 7%, and the Superior partial shading optimization function of the modules reduces the impact of the surrounding environment on the power station. In this way, AIKO’s modules generate more power and lead to lower power cost for the client.