Morning Peak Manufacturing
Morning Peak Manufacturing


Conventional solar peaks at noon, but manufacturing shifts start early. Understanding that, Exceed Solar engineered custom tilt frames with AIKO Comet 600W panels for a 176.43 kW commercial system in Wingfield, South Australia. The strategic engineering approach helps shift peak generation into morning and early afternoon hours, synchronizing renewable energy supply with the facility’s highest production demands and maximizing operational cost savings when electricity consumption is greatest.
Project results
Installed Capacity
+15% Installed Capacity
Annual Power Generation
208,950 kWh/year Annual Power Generation
Annual Savings
18,806 AUD/year Annual Savings
Annual CO₂ Reduction
96 tonnes/year Annual CO₂ Reduction
Client Testimonial Client
Testimonial
The customer required the majority of their solar energy production to occur during the morning and early afternoon to align with their manufacturing operating hours. We strategically installed AIKO 600W Comet panels on a custom tilt frame, designed to optimise energy generation earlier in the day.
Corey Evans Exceed Solar
Related Projects